6.27pm - Thursday 27th February 2025 2,915
The beet washer is back up and running after a couple final fixes in the morning, Steve, Ant, Jamie and Will H wash beet in the morning to cover the weekend’s feeds at the Anaerobic Digester.
Blake fills the Cross Engineering Elephant washer with clean water and then takes the John Deere 6R250 and Joskin tanker to the stubble fields to spread digestate before drilling spring oats next week.
The George Moat bed former is back in the workshop for final maintenance and oil before bed tilling begins on early swede ground in the next month.
The control card for the Pichon tanker finally arrives and is fitted so that the Fastrac Icon 8330 can be out in the fields over the next couple of days tanking alongside the Joskin.